top of page
About Us
Services
Case Studies
Contact
Featured Projects
Previous
01
Penrose House
A full mechanical, electrical and public health services refurbishment at a residential building in North London. 13 apartments required refurbishing after previously sustaining fire and water damage.
02
Handel Mansions
A time-critical refurbishment project focused on upgrading the M&E infrastructure of a large-scale student accommodation block. The scope involved the modernization of internal mechanical and electrical services across multiple floors. The project demanded high-level coordination and project management to meet a strict completion deadline.
03
Etonbury Academy
A specialist life safety installation comprising the delivery of an L2 category fire alarm system. The project scope included the design and installation of new fire detection devices, repeater panels, and complex containment systems. A key challenge, successfully managed by our team was the integration and 'interfacing' of the new system with legacy equipment to ensure site-wide continuity.
04
Stone St Mary’s CofE Primary School
A major mechanical and sustainability project involving the total replacement of a gas boiler and heating distribution system. The works included the installation of modern Air Source Heat Pump plant, new internal distribution pipework, and high-efficiency heat emitters. The project was managed as a full-service delivery, encompassing everything from complex trenching and plant installation to asbestos management and final commissioning.
05
Shenley Brook End School
A significant fire safety infrastructure upgrade. This project was a critical component of the school’s long-term safety strategy, ensuring that the high-occupancy educational environment met all modern compartmentation and life safety standards. Our team managed the end-to-end delivery, from the removal of non-compliant fixtures to the production of final certification and risk assessments.
06
Sandhurst Primary School
Delivery of a comprehensive Design & Build (D&B) electrical upgrade. This project was vital for modernizing the school's aging infrastructure, ensuring the facility met current safety standards and operational demands. Our team managed the complete lifecycle of the project, from the initial strip-out of legacy systems to the final commissioning of a fully integrated electrical and life safety network.
Next
01 / 06
Close
Previous
Next
Penrose House
A full mechanical, electrical and public health services refurbishment at a residential building in North London. 13 apartments required refurbishing after previously sustaining fire and water damage.
Go to link
01
Penrose House
A full mechanical, electrical and public health services refurbishment at a residential building in North London. 13 apartments required refurbishing after previously sustaining fire and water damage.
02
Handel Mansions
A time-critical refurbishment project focused on upgrading the M&E infrastructure of a large-scale student accommodation block. The scope involved the modernization of internal mechanical and electrical services across multiple floors. The project demanded high-level coordination and project management to meet a strict completion deadline.
03
Etonbury Academy
A specialist life safety installation comprising the delivery of an L2 category fire alarm system. The project scope included the design and installation of new fire detection devices, repeater panels, and complex containment systems. A key challenge, successfully managed by our team was the integration and 'interfacing' of the new system with legacy equipment to ensure site-wide continuity.
04
Stone St Mary’s CofE Primary School
A major mechanical and sustainability project involving the total replacement of a gas boiler and heating distribution system. The works included the installation of modern Air Source Heat Pump plant, new internal distribution pipework, and high-efficiency heat emitters. The project was managed as a full-service delivery, encompassing everything from complex trenching and plant installation to asbestos management and final commissioning.
05
Shenley Brook End School
A significant fire safety infrastructure upgrade. This project was a critical component of the school’s long-term safety strategy, ensuring that the high-occupancy educational environment met all modern compartmentation and life safety standards. Our team managed the end-to-end delivery, from the removal of non-compliant fixtures to the production of final certification and risk assessments.
06
Sandhurst Primary School
Delivery of a comprehensive Design & Build (D&B) electrical upgrade. This project was vital for modernizing the school's aging infrastructure, ensuring the facility met current safety standards and operational demands. Our team managed the complete lifecycle of the project, from the initial strip-out of legacy systems to the final commissioning of a fully integrated electrical and life safety network.
Penrose House
Handel Mansions
Etonbury Academy
Stone St Mary’s CofE Primary School
Shenley Brook End School
Sandhurst Primary School
bottom of page